Both Alan and I have been diligently working on the house, pretty much every single night after work. The kitchen is almost all cleared out now, and even missing a wall! After a leak in the roof a while back, the kitchen is needing a new ceiling. We originally planned on replacing the appliances, putting up a new ceiling, and replacing the flooring. That has quickly morphed into:
- Replacing the appliances
- Installing a new ceiling
- Replacing new flooring
- Tearing down all the walls to: Insulate the exterior walls and replace the textured walls with flat, smooth walls
- Tiling and backsplash-ing
- Repainting cabinetry
- Adding extra lighting
- Putting in new cabinetry, sink and faucet
- Running water lines to the fridge so the Water-in-the-Door feature on our refrigerator will actually work, ha!
- and even -
10. Maybe putting bamboo flooring...on the ceiling. Haven't decided on that one yet, just something crazy that I threw out there.
All the rooms have a checklist. The kitchen's is by far the longest. It will take the most time, and the most money. However, as previously posted, Alan and I love to spend time in the kitchen. It will be our most loved room.
I have recently scored us some new things for the house that include but are not limited to: some rockin' storage containers for the kitchen (no really, these are awesome!), accessories, and a new rug for the living room! I got an awesome deal on a rug at Target and now it is anxiously awaiting the day for the floors to be refinished so it can be down and displaying its gorgeousness. As soon as the picture upload function is back up and working, I will post some pictures of my loot.